pipeline-2019a.svg

Search

Categories

fpso-web2.jpg

Eni starts up new well off Angola

Jan 24, 2019
1 min read
Print this page

Eni announced the start-up of a new production well in the Vandumbu field in Block 15/06, offshore Angola.

The Vandumbu field is located about 350 km north-west of Luanda and 130 km west of Soyo, in the West Hub of Block 15/06, in Angola’s offshore.

The start-up of the VAN-102 well – which follows the start-up of the second Subsea Multiphase Boosting System (SMBS) – took place through the N'Goma FPSO and achieved a performance of about 13,000 barrels.

VAN-102 is a further step in the development of the Vandumbu field, launched on 29 November 2018, 3 months ahead of schedule, and which will be completed in Q1 2019 with the start-up of the water injection well.

These start-ups mark the progress in the phased and clustered development strategy that Eni said it has adopted for Block 15/06, and which has allowed the start-up of eight fields since November 2014, when production in the West Hub started with the Sangos field.

Block 15/06 is developed by a Joint Venture formed by Eni (36.84%, Operator), Sonangol P&P (36.84%) and SSI Fifteen Limited (26.32%).

RELATED POSTS

dmg events Global Energy Exhibitions & Conferences