pipeline-2019a.svg

Search

Categories

TechnipFMC awarded EPCI contract for Lancaster EPS project

TechnipFMC awarded EPCI contract for Lancaster EPS project

Sep 18, 2017
2 min read
Print this page

TechnipFMC has been awarded an Engineering, Procurement, Construction and Installation contract from Hurricane Energy’s Lancaster EPS Project, West of Shetland.

The Lancaster field is located in blocks 205/21a, 205/22a and 205/26b and in relatively shallow water depths of 160 metres. Hurricane Energy said that Lancaster EPS remains on schedule for first oil in the first half of 2019.

The contract will be executed as an integrated Engineering, Procurement, Construction and Installation (iEPCI) project.

The contract covers the provision of subsea equipment including umbilicals, risers, flowlines and the subsea production system for the Lancaster Early Production System (EPS) Project. In addition, TechnipFMC will also install the subsea equipment, turret buoy and mooring system.

Subsea installation activities at Lancaster are scheduled for summer 2018.

Hallvard Hasselknippe, president of TechnipFMC’s Subsea Projects, said: “This award demonstrates our leadership position in iEPCI and we are honored that Hurricane Energy is embracing the new way of doing business, engaging with us early through integrated FEED studies and realizing the full scope through an integrated EPCI.”

RELATED POSTS

dmg events Global Energy Exhibitions & Conferences