pipeline-2019a.svg

Search

Categories

Shell begins production at Nigeria's Gbaran-Ubie

Shell begins production at Nigeria's Gbaran-Ubie

Aug 23, 2017
2 min read
Print this page

The Shell Petroleum Development Company of Nigeria joint venture has started production at Gbaran-Ubie Phase 2, a major project in Nigeria’s Niger Delta region.

Phase 2 follows the first phase of the Gbaran-Ubie integrated oil and gas development, which was commissioned in June 2010. Peak production of around 175,000 barrels of oil equivalent (boe) per day is expected in 2019.

“Today’s announcement is a positive step for Shell’s global gas portfolio,” said Andy Brown, Shell’s Upstream Director. “It is also good news for Nigeria as gas from Gbaran-Ubie Phase 2 will strengthen supply to the domestic market and maintain supply to the export market.”

Eighteen wells have been drilled and a new pipeline constructed between Kolo Creek and Soku which connects the existing Gbaran-Ubie central processing facility to the Soku non-associated gas plant. First gas flowed from the wells in March 2016, with the facilities coming on stream in July 2017.

The Shell Petroleum Development Company (SPDC) is the operator of a joint venture between the government-owned Nigerian National Petroleum Corporation (NNPC, 55 per cent), SPDC (30 per cent), Total E&P Nigeria Ltd (10 per cent) and ENI subsidiary Nigerian Agip Oil Company Limited (5 per cent).

RELATED POSTS

dmg events Global Energy Exhibitions & Conferences